Installation Guide DAMPA Space eng - Flipbook - Side 4
1
2
1200 mm
600 mm
To ensure a comfortable worktop height, it is recommended that
the bottom of the wall rails are mounted 600 mm above the floor.
The right and left wall rails are installed with a distance of 1200
mm measured from the outer edges of the rails.
At this height, the worktop can be positioned 75, 80, 85 or 90 cm
above the floor.
The wall rails must be installed vertically level and fixed through the
holes in the mounts using a minimum of three frame screws or
equivalent at the top, middle and bottom.
3
4
The top track is installed with the folded edge facing the wall and
joined to the holes at the top of the wall rails using a bolt and nut.
If a back plate of the Forbo Bulletin Board is required, it should be
glued directly to the wall and adjusted so that its bottom edge
aligns with the bottom of the wall rails.
5
6
The lower section of the wall rails are fitted with a row of holes for
mounting the worktop and shelf support.
The shelf supports are mounted to the wall rails by inserting the
ratchet on the fitting through the top hole in the shelf support, after
which a locknut is fitted to the threaded section at the bottom of
the shelf support.
The lowest possible position for the worktop is the third hole from
the bottom (75 cm above the floor), as the two holes below the
worktop are used for mounting the fitting for shelf support.
The fittings are attached to the wall rails using bolts and nuts.
4